About the Project

The proposed Clune Wind Farm is located approximately 5.5km1 south of Tomatin in the Highlands.

The proposed development is for up to 26 turbines with a tip height of up to 200m, and an overall generating capacity of 187.2MW and a battery energy storage system (BESS), rated at 100MW. Clune Site Layout

 


Generating enough clean, green electricity to power the equivalent of approximately 215,000 homes annually.

 

Reducing carbon emissions by over 296,200 tonnes each year3.

In February 2025, we submitted an application to the Energy Consents Unit and please visit the Planning Application page for further information and the application documents.

In February 2024, we submitted a Scoping Report to the Scottish Government’s Energy Consents Unit (ECU) which set out and sought feedback on the proposed scope of environmental assessment work.  You can view or download a copy of the Scoping Report by clicking on the links below:

 

1 This distance is given from the approximate centre point of the site to the centre of Tomatin.

2 Calculated using the most recent statistics from the Department of Energy Security and Net Zero Strategy (DESNZ) showing that annual GB average domestic household consumption is 3,239kWh (as of January 2024, updated annually).

3The carbon reduction figure is taken from the EIAR using the SEPA Carbon Calculator for Wind Farms.